Removing debris generated from drilling out 96 frac plugs in a low bottom pressure well requires engineered fluid rheology. HydroLyft’s density was modulated on the fly to adapt variable well pressures. The viscous fluid entrapped the drilled out plug parts and effectively removed them for the wellbore.
PUMP RATE – in 3.25 bbl. – out 3.03 bbl.
FLUID VISCOCITY – 66 sec